GLENCORE – ERNEST HENRY MINE

The Ernest Henry Mine required construction work to be completed on their existing tailings dam embankment in order to meet the required factor of safety for the long-term stability of the facility after the mine life was extended by 10 years. This work required OzM to load and haul over 1.2M BCM and place it with GPS guided dozers to achieve high design tolerance.

The project was completed on time and on budget, achieving practical completion in January 2022.